Construction & Material Calculators
Estimate concrete, paint, flooring, labor, remodeling, and building materials with free construction calculators.
Construction & Material Calculators list
- Paint Calculator
- Flooring Calculator
- Tile Calculator
- Concrete Calculator
- Mulch Calculator
- Gravel Calculator
- Moving Cost Calculator
- Construction Estimate Calculator
- Labor Burden Calculator
- Crew Labor Cost Calculator
- Change Order Calculator
- Progress Invoice Retainage Calculator
- Roofing Calculator
- Drywall Calculator
- Framing Calculator
- Board Foot Calculator
- Insulation Calculator
- Siding Calculator
- Decking Calculator
- Fence Calculator
- Rebar Calculator
- Demolition Debris Calculator
- Stair Calculator
- Kitchen Remodel Cost Calculator
- Bathroom Remodel Cost Calculator
- Basement Finishing Cost Calculator
- Room Addition Cost Calculator
- Window Door Replacement Cost Calculator
- Contractor Break Even Calculator
- Square Footage Calculator
- Topsoil Calculator
- Sod Calculator
- Wallpaper Calculator
Choose the right tool
Paint Calculator
Packages needed = ceil(length in feet × width in feet × 1.10 / package coverage in square feet). This includes a fixed 10% waste allowance and rounds up to whole packages.
Flooring Calculator
Packages needed = ceil(length in feet × width in feet × 1.10 / package coverage in square feet). This includes a fixed 10% waste allowance and rounds up to whole packages.
Tile Calculator
Packages needed = ceil(length in feet × width in feet × 1.10 / package coverage in square feet). This includes a fixed 10% waste allowance and rounds up to whole packages.
Concrete Calculator
Material volume is length × width × depth in feet. Divide cubic feet by 27 for cubic yards. Depth must be in feet, not inches, before multiplication.
Mulch Calculator
Material volume is length × width × depth in feet. Divide cubic feet by 27 for cubic yards. Depth must be in feet, not inches, before multiplication.
Gravel Calculator
Material volume is length × width × depth in feet. Divide cubic feet by 27 for cubic yards. Depth must be in feet, not inches, before multiplication.